Master of Engineering

HFT Stuttgart’s MEng in International Project Management (IPM) is designed for professionals in the fields of construction, infrastructure or engineering; equipping them to take leading roles in complex international projects.

Attracting  experienced postgraduates from around the world, our Master’s programme offers two specialisations, IBPM and IITM. The specialisations IBPM - International Building Project Management provides you with the knowledge and tools to structure and manage complex superstructure projects: either self-employed, as a lead consultant for an international company or as a leading architect or engineer. The specialization IITM - International Infrastructure Technology & Management will equip you with the technical and managerial skills to successfully develop and implement strategies for large-scale infrastructure projects.

Every student must choose one of the two specialisations. Although most of the IPM classes are general project management classes and therefore held jointly, a small portion of the IPM curriculum is dedicated to the specializations to ensure that each field is thoroughly covered.

Students acquire the soft skills and the in-depth knowledge of the latest tools, processes and organisational methods that are essential to deliver successful international projects.

Our flexible, modular structure allows students to study full time or to combine their studies with part-time work to gain both academic learning and practical experience.

 

Application deadline
Winter Semester
05th Nov - 28th Feb, 05th May - 15th Jul
Summer Semester
05th May - 31st Aug, 05th Nov - 15th Jan
Study time
3 semester (full-time), 5 semester (part-time)
Study title
Master of Engineering

Study Programme

20 +Years of experience in international education

60 +Different Nationalities

400 +Successful Graduates

120 +Dual Degree MBA Graduates

Programme Content

The programme focuses on a holistic process-related understanding of the planning, execution and operation, taking into account the advancing digitalization; as well as on the soft skills development which are essential for becoming a successful Project leader.

Specialisations

IBPM

Students following IBPM gain deeper insights to Building construction and Real estate project management.

IITM

Students following the IITM option become well equipped to develop and implement local and international infrastructure strategies.

Flexible Options

Full time study

The programme takes two semesters plus a further semester to prepare and present a Master’s thesis. Students attend classes on Thursday, Friday, Saturday and Monday.

Part time study

The programme takes four semesters plus a further semester to prepare and present a Master’s thesis. Students attend classes on Friday, Saturday and Monday during the first two semesters and on Thursday, Friday and Saturday during the third and fourth semesters.

25 Classroom size per semester

40 + Professors & Lecturers

90 ECTS

IPM Calendar

Summer Semester

Winter Semester

Projects

IPM Case Study Week in winter semester 2023-24

Exploring Academic Horizons

View Article

IPM Case Study Week in wintersemester 2022-23

This year's international Case Study Week took place in Liverpool, UK.

View Article

Quality Ensured

The quality of the HFT Stuttgart IPM Master’s Programme is assured through external accreditation.

It was first accredited by ASIIN, a renowned external academic accreditation body, in 2004. It was re-accredited by them in 2009 and again, most recently on 08.12.2023 and is valid until 30.09.2031.

The authenticity of the acceditiation is stated on the ASIIN website.

Double Degree (M.Eng.+MBA)

About the Programme

After completion of the taught modules in Stuttgart (60 ECTS), students have the opportunity to continue their studies at Edinburgh Napier University. While the Programme in Stuttgart focuses on Project Management in the construction industry, the Programme in Edinburgh focuses on Strategic Project Management. Students that embark on the Double Degree Programme graduate as Master of Engineering (M. Eng) and Master of Business Administration (MBA).  

This opportunity strenghtens the aspect of internationality by studying in Germany and the UK.

 

Alumni

I have worked for several years in different countries (Germany, China, Middle East and other European countries. This experience reinforced the wish to also educate myself further with an international perspective, which led to the choice of IPM and to the MBA in Liverpool.

I would like to highlight the synergy with the MBA in Liverpool, which added a very deep theoretical and even more scientific approach to the practice-oriented input of the IPM, so the combination added a lot of value and convinced me to further continue this path with a DBA doctorate programme.

After having led PM and consulting teams, I am meanwhile part of the international management of Drees & Sommer and internationally responsible for our strategic organizational development (location development, M&As, quality and knowledge management). The international experience and PM know-how, strengthened through the IPM course, and the knowledge about strategy, leadership and business through the MBA have equipped me with the wide view which is required for this strategic role.

MORITZ MILLER
Background: Architecture | Current Company: Drees & Sommer

 

After my Bachelor Degree, I gained professional experience for 5 years in an international construction company. Following my professional experience, I came to the conclusion that professional education is essential as the management of international construction projects is a very intensive and challenging process. The future-oriented education model of the HFT IPM Master's Program, which covers all aspects of project management with the latest methods and tools, made this program unique for me.

During my time in IPM, I gained knowledge of the latest project management methodologies on an international level, as well as leadership and adaptability skills in the rapidly changing environment of the construction industry in the 21st century. In addition to all these, the program, which was jointly created by professionals and academics, provided a wide network which enabled me to establish close connections with successful international companies where I can realize my potential in my career path.

Learning the latest digital methods and tools in construction project management through the IPM program has helped me to rapidly advance in my profession. The skills I have acquired, particularly in the area of lean methodology and sustainability, have placed me in a prominent position in my career.

SELIN SAADET THORSTEINSSON, TURKEY
Background: Architecture

After my Bachelor Degree, I worked as a Quantity Surveyor in Kuala Lumpur and Singapore for around 3.5 years. I chose IPM because it’s value-for-money while providing wide-scope learning modules.

The overall experience at IPM is exceptional as the aspects of project management are comprehensively covered in the modules and the knowledges are well delivered by the academic personnel. The most beneficial skills to my career development include change management, intercultural understanding, project development, real estate development and consultant business strategies which are quite relevant to my role in a German project management consultant firm.

I am currently a project manager, who covers the scope of project management and site management for mixed-used development projects. I started with the employer as a work student and converted into a full-time position after completion of study. German Language Proficiency is a must to join the company. I have completed level B2.2 and I still continue improving my language skills through daily practice.

JEBSEN LEE, MALAYSIA
Background: Quantity Surveyor

I am originally from Iran, where I spent the first 17 years of my life. Then I moved to the UK and finished my bachelor studies in Civil Engineering at the University of Bath. In 2017 I received my Masters degree in International Project Management from the University of Applied Sciences in Stuttgart.

IPM was a good mixture of theory and practice. I learnt a lot from experts and practisioners in the industry. The two courses that inspired me are Quality Management especially Lean Management and Project Delivery Methods, which gave me insights into innovative ways of managing and delivering projects. Inspired by these Modules I picked the topic of my master thesis, which was extremely beneficial for my career development in this field. Since then I am passionately committed to the Lean transformation of the construction industry and coach project participants in Lean mindset and the application of Lean methods.

I am a Senior Lean Manager at ECE Group Services GmbH & Co. KG, where I lead the Lean transformation and the continuous improvement process of the Architecture & Construction division. In addition, I lead the German Lean Construction Institute’s Regional Practice Group in Hamburg. My expertise in Lean Management and Lean Construction, experience in concultancy as well as having professional German language proficiency were crucial for this role.

MEHRNOUSH NAYEBI, IRAN
Background: Civil Engineer

 

IPM Alumni Network

Through meaningful interactions and discussions around a sustainable and active professional network with present and future alumni, the IPM alumni group allows you to tap into the full potential of the global IPM community.

Join Alumni Community on Linkedin and become part of HFT-IPM family!

Industry, Advisory Board & Scholarship

Advisory Board Awards

This year's Master's thesis award in the IPM degree programme went to Tariro Muparadzi

Congratulations on this award!

View Article

This year's award for the Master's thesis in the IPM degree programme went to Uday Marimallaiah

Congratulations on this award!

View Article

Career Prospects

Scholarships

A limited number of scholarships are available to all students of HFT Stuttgart. Students with an outstanding academic performance, demostration of social commitment and/or special personal circumstances qualify for the scholarships. Students can apply in the first semester of study and not before that.

Scholarship types: 

  • Germany Scholarship / Deutschlandstipendium
    • 3,600 € per year paid in monthly instalments of 300 € over a period of 12 months.
  • University foundation / Studienstiftung der HFT Stuttgart
    • 1,500 € per year paid in two instalments of 750€ over a period of 2 semesters.

 

In addition to the HFT Stuttgart scholarships other organisations e.g. DAAD offer attractive scholarships for which you can apply prior to arriving in Germany.

Admission Process & Tuition fees

Admission Requirements

Degree, Work Experience

1. A first degree (Bachelor, Magister, Diploma or equivalent) in a relevant discipline (e.g. architecture, civil engineering, construction or design) awarded after at least three years of full time study with above average examination results.

  • The first degree must carry a minimum of 210 Credit Points (CP) which requires a full time programme of seven standard semesters.
  • In the event that the first degree carries only 180CP, or six standard semesters, the student must carry out or submit a study task with a scope of 30CP during the Master’s programme. The Programme Dean will offer a choice from a selection of study modules, subject to confirmation from the examinations office.

 

2. At least one year of relevant professional experience after award of the first degree

 

Proficiency in the English language

All applicants who are not native English speakers must provide evidence of proficiency in the English language as follows:

Test of English as a Foreign Language (TOEFL)

  • 550 points in the paper-based test or,
  • 213 points in the computer-based test or,
  • 80 points in the internet-based test.

 

Alternatively the applicant can demonstrate a score of 6.5 or higher in an Academic International English Language Testing System (IELTS Academic)

The official TOEFL report can be sent directly through the Educational Testing Service (institution code: 8514).

Tuition Fees

The Master's programme International Project Management is a so-called continuing education programme. A continuing education programme is a fee-based course of study for which tuition fees are incurred. The following table provides information on tuition fees:

Full-time
1st Semester  6.000 €
2nd Semester  6.000 €
3rd Semester  3.000 €
Total15.000 €

 

Part-time (for EU-Citizens / residents only)
1st semester  3.000 €
2nd Semester  3.000 €
3rd Semester  3.000 €
4th Semester  3.000 €
5th Semester  3.000 €
 15.000 €
Additional costs (costs which will occur during the programme for full-time and part-time students)
Compulsary non-tution fees: 200 € approx / Semester
Compulsary field trips (kick-off event, international project week and excursions): 1.500 € approx
Each additional Semester: 1.500 €

 

*Students who care for and bring up a child under the age of fourteen and/or students whose disability within the meaning of § 2 of the Ninth Book of the German Social Code (Socialgesetzbuch) has a significant negative impact on their studies are advised to check their eligibility for a tuition fee reduction.

Further assistance is available at Accessible university for those with disabilities and/or chronic illnesses.

Step by Step Tutorial

Online Application

  1. Click the blue “Apply now” button on the cover photo. You will be redirected to the application portal.
  2. Switch the language to English (if needed) using the option in the bottom-right corner.
  3. Register as a new applicant to create your account.
  4. Select “Master International Project Management” and choose your preferred specialisation: IBPM or IITM.
  5. Complete the online application form and upload all required documents.

FAQ

How much will the course cost me?

Do I need a proof of English language skills?

My language of Instruction was English, do I still need a TOEFL/IELTS?

Is any professional experience required to attend the course?

Is there an age limit for applicants?

When am I eligible for part-time studies?

The state government of Baden Württemberg has introduced study fees for non-EU citizens of €1500 per semester, Do I have to pay this?

I'm an Erasmus student can I be exempted from Tuition Fees?

I have refugee status can I be exempted from Tuition Fees?

How and when can I apply for the scholarship?

My visa is granted. When should I arrive in Germany?

On which days will my lectures be held?

Will I be able to work in Germany during my studies?

What is a Break semester? How does it work?

How does the MBA Dual Degree programme works?

How about working in Germany after my graduation?

Can I undertake a PhD study after graduating?

How is the quality of the programme ensured?

How much is the living cost in Stuttgart per month?

How can I get health insurance?

How far away from the University will I live?

Contact

Name & Position E-Mail & Telephone
Max HaugDean of studies International Project Management+49 711 8926 2679 8/3.11
Kristina SassenbergSecretary+49 711 8926 2679 8/3.28
Amruta JayawantAcademic Associate+49 711 8926 2770 8/3.28